Case Study:

Woodside Energy

Coca-Cola Amatil

Industry:

Region:

Oil & Energy

Asia-Pacific Japan

Woodside Energy is an Australian petroleum exploration and production company. Woodside is the largest operator of oil and gas production in Australia and also Australia’s largest independent dedicated oil and gas company.

HXM Move powered by the Nexus Suite

Woodside Energy were on SAP On-Premise since the mid-2000’s and are moving to ECP / EC via a Nexus Powered “Lift-and-Shift” with remediation (i.e. Enterprise Restructure, Configuration Rationalisations etc)

TIK in partnership with

392

Configuration tables

665K

Records

24

Minutes

Time

Without the Nexus Suite this would have taken over 6 months of effort by an SAP functional resource

Cost

Woodside Energy saved over 6 months of consulting fees, when compared to the cost of the software equates to a return on investment of over 730%.

Benefit

The day after the configuration was shifted, Woodside Energy were running payroll within ECP and comparing the results between ECP and their SAP On-Premise production environment for a subset of around 500 employees through the use of the Nexus Suite Payroll Verification Module.

Woodside Energy has the full history of their employee master data available from within their Employee Central Payroll environment.

Go-Live will take approximately approximately, half a second per employee, for 3.3K employees it’ll take approximately 45 minutes during the Go-Live (this includes all master data, time & payroll results data, audit log data etc)